Friday, April 26, 2024

Water Filtration Plant

We were mandated to perform all necessary concrete repairs in the reservoir which is located 30 feet below ground level. Accessibility posed a distinct challenge, since the only possible access is through trapped doors measuring 3 feet x 3 feet.

Moreover, while working in the enclosed space, our team also had the mandate to build a new 16 inch thick concrete wall in order to separate the collected water from the river from the filtered drinking water. This new separating wall is 30 feet high and 80 feet long.

Delivering materials, tools, and supplies into the enclosed work space while ensuring the safety of all personnel was an interesting and challenging experience. Despite the complexity and magnitude of the project, A.G.L.P. was once again able to deliver on time and on budget.